Commercial Exterior Grading Case Types

Building Permit applications are to be completed online. Please go to Online Permit Applications; enter the information directly into the County’s Permitting System; and print three (3) copies of the computer-generated application prior to visiting the Permits Center. (Printers are NOT available onsite for customers.)


Work Descriptions


  • Work Description for CG: Concrete Slab or Replacement (non-structural); Concrete Sidewalk; Concrete Steps; Gas Island; Handicap Ramp (concrete); Office Trailer; Parking Lots; Pedestrian Walkway; Shed; Telecommunication Tower (unmanned cabinet); Roof (change in pitch or configuration)
  • Work Description for CGUW: Mobile Homes (replacements)
  • Work Description for CGW: Concrete Slab or Replacement (non-structural); Concrete Sidewalk; Concrete Steps; Gas Island; Handicap Ramp (concrete); Light Poles

CG: Not a Walk-thru


Documents/Approvals Required:
  • Seven (7) Site/Plot Plans - Original Signature and Sealed
  • Two (2) Architectural Drawings - Original Signature and Sealed
  • Two (2) Structural Drawings - Original Signature and Sealed
  • Two (2) Electrical Drawings - Original Signature and Sealed (if applicable)

CGUW/CGW: May be Walked-thru


Documents/Approvals Required:
  • Five (5) Site/Plot Plans - Original Signature and Sealed
  • Two (2) Architectural Drawings - Original Signature and Sealed
  • Two (2) Structural Drawings - Original Signature and Sealed
  • Two (2) Electrical Drawings - Original Signature and Sealed (if applicable)

Reviewed By


  • Health
  • WSSC (not required for CGUW/CGW)
  • M-NCPPC (not light poles)
  • Electrical
  • Mechanical
  • Fire
  • Structural
  • Site

Payment


Cash, Check or Money Order Only:
  • ​Permit Fee =  ​Cost of Construction x 0.008 + $ ($ minimum)
  • Grading Fee​ = ​$
  • Use & Occupancy (if applicable)​​ ​= $ per discipline
  • ​​M-NCPPC (if applicable) ​= $

Note


All plans on this checklist must be provided at the time of permit application. Customers must comply with local municipalities and township requirements prior to starting construction.